MMT November Observing Statistics


By admin - Posted on 08 December 2008

Time Summary

 

Percentage of time scheduled for observing          100.0
Percentage of time scheduled for engineering          0.0
Percentage of time scheduled for sec/instr change   0.0
Percentage of time lost to weather                      26.2
Percentage of time lost to instrument                    1.2
Percentage of time lost to telescope                     1.5
Percentage of time lost to general facility              0.3
Percentage of time lost to environ. (non-weather)   0.0

Percentage of time lost                                      29.2

—————————————————————————————–

Breakdown of hours lost to telescope: 5.25 (wfs failure, hacksaw crash, pointing/rotator issues

Breakdown of hours lost to facility: 1.0 unscheduled instrument change