You are hereBlogs / admin's blog / MMT December Observing Statistics

MMT December Observing Statistics


By admin - Posted on 16 January 2009

Time Summary

 

 

Percentage of time scheduled for observing                          90.0

Percentage of time scheduled for engineering                       10.0

Percentage of time scheduled for sec/instr change                 0.0

Percentage of time lost to weather                                         41.7

Percentage of time lost to instrument                                       7.7

Percentage of time lost to telescope                                        0.3

Percentage of time lost to general facility                                 0.0

Percentage of time lost to environment (non-weather)             0.0

Percentage of time lost                                                           49.7
———–
Breakdown of time lost to telescope: M1 panic, guider server crash, wfs failed attempts