MMT February Observing Statistics

Leave a Comment Percentage of time scheduled for observing              100.0 Percentage of time scheduled for engineering              0.0 Percentage of time scheduled for sec/instr chan           0.0 Percentage of time lost to weather                           38.8 Percentage of time lost to instrument                         0.2 Percentage of time lost to telescope                           0.3 Percentage of time lost to general facility                   0.2 Percentage of time lost to environment (non-weather)   0.0 Percentage of time lost                                           39.4 — Breakdown of time lost to telescope: broken mount miniserver, hacksaw crash; Breakdown of time lost to general facility: hoseclamp reboot;