Time Summary

Percentage of time scheduled for observing                    90.2 Percentage of time scheduled for engineering                   9.8 Percentage of time scheduled for sec/instr change            0.0 Percentage of time lost to weather                                    45.1 Percentage of time lost to instrument                                 0.5 Percentage of time lost to telescope                                  2.8 Percentage of time lost to general facility                           0.0 Percentage of time lost to environment (non-weather)       0.0 Percentage of time lost                                                     48.4

 ——–

Breakdown of time lost to telescope: secondary (f/15 problem),

pointing/computer problem with AO, PCR server, wfs camera,