Parking Lot Work at the MMT

Leave a Comment Improvements to the summit parking lot began mid-March to create a pathway allowing easier movement of instruments between the Instrument Repair Facility (IRF) and main MMT building. The pathway is completed, but remains covered to ensure best results for the final condition of the concrete.